Architectural Project Process in Urban Transformation: A Step-by-Step Guide
Urban transformation aims to replace risky buildings with safe, modern and healthy homes. However, it is a complex process with both legal and technical steps. In this article we summarize the architectural project process in urban transformation by its stages.
1. Risk Assessment
The process generally begins with the earthquake resistance of the building being analyzed by an authorized organization. If a risky-building report is issued, the decision to transform comes onto the agenda. At this stage, informing the building’s residents and the joint decision-making process are important.
2. Unit Owners and the Decision
For transformation of risky buildings, a certain majority of the unit owners (at the ratio defined in the legislation) is required. Contractor selection, the land-share (unit-for-land) agreement and eviction processes are clarified at this stage. For the legal details, getting support from a lawyer and an architect reduces possible problems.

3. Architectural and Structural Project
Architectural project
The new building’s floor plans, façades, apartment distribution and common-area layout are prepared. Depending on the parcel’s situation, zoning rights, the building boundary and parking requirements are taken into account.
Structural and other projects
In parallel with the architectural project, the structural, mechanical and electrical projects are prepared. Design compliant with the earthquake code and the geotechnical survey are the foundation of this stage.
4. Permit and Construction
The prepared projects are submitted to the municipality, and after approval the building permit is obtained. We described the process in detail in our article on the architectural project and building permit process. During construction, site inspection, material quality and production follow-up are critically important.
5. Occupancy Permit and Handover
When construction is finished, the building occupancy permit (iskân) is obtained, and after the apartments are handed over, title-deed procedures are carried out. The energy performance certificate and insulation performance are checked at this stage; for insulation, see our thermal insulation and cladding guide.
Things to Watch in Transformation
- Work with an authorized and experienced architect and structural engineer.
- Make contracts in writing and in detail; specify the delivery date and penalty clauses.
- Ask for a design suited to the climate and orientation; see home design suited to Kayseri’s climate.
- Review the apartment plans and common areas in advance.

Frequently Asked Questions
Is the approval of all unit owners required for urban transformation?
For risky buildings, the legislation considers a certain majority sufficient; check the current legislation and the competent authority for details.
How long does an urban transformation project take?
From risk assessment to the occupancy permit, the process can generally take 2–3 years, depending on the size of the project and the speed of agreements.
Plan Your Project with Saçcıoğlu Architecture
For urban transformation and new housing projects, we manage the project, permit and construction process as part of our architecture office services. Since 2017 we have been designing and building residential, villa, commercial and public buildings in Kayseri and the surrounding provinces. To discuss your project, you can reach us through our contact page or call 0505 884 76 00. You can review the work we have completed on our projects page.